Real Results — Case Study

An international customer requirement called for packers with special dimensions and customized manufacturing, together with a conversion kit for artificial lift. MCT addressed the engineering and manufacturing scope and delivered internationally.

01 The Challenge

The application required packers with special dimensions and manufacturing requirements, together with a conversion kit for artificial lift. The equipment also needed to be prepared for international delivery.

02 The MCT Approach

MCT developed the customized packer engineering around the required dimensions and manufacturing scope. The solution included a conversion kit for artificial lift, with manufacturing and international delivery coordinated as part of the requirement.

03 The Result

The customized packers and artificial-lift conversion kit were supplied for international delivery. The outcome reported here is the completed engineering, manufacturing and delivery scope.

04 What Made the Difference

The value was in addressing the specific dimensional and manufacturing requirements alongside the artificial-lift conversion requirement. Coordinating these elements allowed MCT to supply a customized solution for an international application.

For application engineering and field assistance, explore MCT technical support.

More Real Results: Critical Job. Cross-Continent. 4 Weeks. Delivered. · Engineered TRSV Solution. 6 Weeks to Delivery. 6 Wells Restored.

To discuss a similar requirement, contact MCT.