Real Results — Case Study

A North African well-restoration campaign needed a retrofit solution for an existing Tubing-Retrievable Safety Valve (TRSV) system. MCT delivered the engineered equipment in six weeks. The latest reported result is six wells restored.

01 The Challenge

An international oilfield service company needed a specialised flow-control solution for a global operator’s North African campaign. The equipment had to be compatible with the existing TRSV configuration, while conventional suppliers were quoting extended lead times.

02 The MCT Approach

MCT worked with the customer to understand the existing configuration and engineer the retrofit solution. The scope included a metal-to-metal equalising valve, associated accessories, and matching running and pulling tools. Engineering and manufacturing were coordinated to deliver field-ready equipment in six weeks from initial engagement.

03 The Result

The latest customer update confirms that six wells have now been restored. The six-week figure refers to the original engineered-equipment delivery timeline; the six-well figure reflects the current reported campaign result.

04 What Made the Difference

The solution was engineered around the existing TRSV configuration, with the valve, accessories and deployment tools addressed together. Technical compatibility, coordinated manufacturing and customer support connected the engineering scope with the well-restoration campaign.

For application engineering and field assistance, explore MCT technical support.

More Real Results: Critical Job. Cross-Continent. 4 Weeks. Delivered. · Customized Packer Engineering for International Applications

To discuss a similar requirement, contact MCT.